more HP nonsense in my knitting ADD
I've made two puffskeins (will post pics later) as well as a wand cozy for Sabrina and more book marks
So I started a stichionery belt, and need to rush through because I want the needles for something else ;-)
And I want to make the moorish beach tunic in the IC
and I'm still working on the lace of Marta, which I want to work on ITR until the arms
And I'm doing the back and bottom part of my soy silk shell as planned, but the gauge is the same as Isabella, so I'm going to try that for the neckline.
Man, I need more time and extra arms to knit. And crochet. Oh, I'm wrestling with crochet/knitting for the plastic bag tote. Sigh.